CONTROL PANEL AND ELECTRICAL TESTS :
FACILITIES OF QUALITY CONTROL DEPARTMENT
The new era of crane manufacture incorporate latest technologies, viz;
Sr.No |
Component/ Operation |
Characteristic Checked |
Category |
Type/Methode of Check |
Extent of Check |
Acceptance of Norm |
Agency |
||
P |
W |
V |
|||||||
1.10 |
Structural Materials for Grinders, End Carriages, Crab and Platform | 1 Sample per size of plate and other structurals | RM |
Chemical & Mechanical | MA |
IS
: 2062 |
4 |
3 |
2 |
1.20 |
Rope Drum Seamless Steel Tubes | 100% | RM |
Acid Etching end | MA |
IS
: 3177 |
4 |
3 |
2 |
1.30 |
Brake Drum | 1 Sample | Rm |
Chemical Check | MA |
IS
: 1875 |
4 |
3 |
2 |
1.40 |
Gears & Pinions | 1 per size per Lot | RM |
Chemical Check | MA |
IS
: 1570 |
4 |
3 |
2 |
1.50 |
Sheave / Pulleys | 1 Lot | RM |
Chemical Check | MA |
IS
: 2062 |
4 |
3 |
2 |
1.60 |
Wheels | 1 Sample | RM |
Chemical Check | MA |
IS
: 1570 |
4 |
3 |
2 |
2.10 |
Hooks | 100% | BOC |
U.T. | MA |
IS
: 3815 |
4 |
3 |
2 |
2.30 |
Wire Rope | 100% | BOC |
Examination of Reports for Braking Load | MA |
IS
: 2266 |
3 |
2 |
2 |
2.30 |
Rails / Sq.Bar | 100% | BOC |
Visual | MA |
BS
: 80A |
3 |
2 |
2 |
2.40 |
Bearings | 100% | BOC |
Visual | MA |
Mfgrs.
Standard |
3 |
2 |
2 |
2.50 |
Couplings | 100% | BOC |
Visual | MA |
3 |
2 |
2 |
|
3.10 |
Welding of Rope Drum | 100% | Welding |
RT of Joint | MA |
IS
: 4853 |
4 |
3 |
2 |
3.20 |
Welding of Box Grinders, Crab, End Carrige, L.T. Frames | 100% Random |
Welding |
Visual MPI / DPT | MA |
IS
: 822 IS : 3658 |
3 |
2 |
2 |
3.30 |
Welding (Sounding) |
100% | Welding |
R.T. Butt welds in Tension | MA |
IS
: 4853 |
4 |
3 |
2 |
3.40 |
Gears
& Pinions a) U.T. |
100% | U.T. Check | MA |
IS
: 3664 |
4 |
3 |
2 |
|
| b) Hardness | 100% | Hardness | MA |
55-60
HRC |
3 |
2 |
2 |
||
| c)
Dimensional Accuracy |
Random | Measurement | MA |
IS
: 4059 |
3 |
2 |
2 |
||
| d) MPI | Random | Crack Detection | MA |
IS
: 3658 |
3 |
2 |
2 |
||
| e) Surface Finish | Random | Surface Check | MA |
1.6
microns max. |
3 |
2 |
2 |
||
3.50 |
Gear
Boxes a) Sound Level |
100% | Sound Check | MA |
To
be verified by Consultant |
3 |
2 |
2 |
|
| b) Leakage | 100% | Check by Consultant | MA |
To
be verified by Client |
2 |
2 |
1 |
||
3.60 |
Hooks | 100% | Proof Load | MA |
IS
: 3815 |
4 |
3 |
2 |
|
4.10 |
Motors | 100% | EC |
Review of Routine TCs | CR |
IS
: 325 |
3 |
2 |
1 |
4.20 |
Cables | 100% | EC |
Review of Type Test / Routine Test | MA |
IS
: 694 IS : 554 IS : 9968 |
3 |
2 |
1 |
4.30 |
Control Panel, Wiring, Marking Input, Output sequence. | 100% | EC |
Visual check of fitting of components | CR |
Electrical
Drawing IS : 3177 |
3 |
2 |
1 |
4.40 |
Components | 100% | MC |
Visual / rating | MA |
Electrical
Drawings IS : 3177 |
3 |
2 | 1 |
4.50 |
Complete Assembled Cranes | 100% | Crane |
Visual & Checking of overall dimensions alignment & Completeness | CR |
Final
Tech. Spec / Approved Drawings IS : 3177 |
3 |
2 | 1 |
| 100% | Load Test / Overload Test, Deflection Test, Speed & Current Measurements | CR |
IS
: 3177 IS : 807 Approved Drawings |
3 |
2 | 1 | |||
4.60 |
Painting | 100% | Surface preparation | MI |
Client's
Specs. |
3 |
2 | 1 | |
4.70 |
Lubrication | 100% | Client'sSpecs. |
3 |
2 | 1 | |||
Abbreviation |
|||||||||
P
: Performed By |
|||||||||
We have got two full fledge erection Teams equipped with motorized Winches of 10 T and 20T Capacities along with Derriks and other accessories. The teams are managed separate Electrical and Mechanical Engineers. At any given time, we are equipped to cater the erection of cranes at two different sites. In addition, we have appointed qualified Service Engineers to offer prompt Services to our Customers and attend their problems within 24 hours as far as possible.
We provide the Customers with detailed maintenance manual and also adequately train the personnels appointed by the client to handle minor breakdowns during the installation of the cranes. We also recommend maintenance of certain spares as stock so as to curtail the down time of the cranes therby leading to reduction in the production loss.